The CPHC board of directors visited the Living Wisdom build site on February 7th, 2025. The tour allowed the board to inspect construction progress and material quality. It was encouraging to see that kitchen cabinets were installed in one unit and the walls and ceiling had been painted in several units. The steel framing was installed for the community building, including the heavy uprights and some of the roof.